The Project required a versatile structural liner to rehabilitate a kilometer of DN600 sewer mains, at varying lengths, depths and flows without interrupting service to stake holders all located throughout the central city area.
| Medium | Diameter | Pipe Material | Project Length | Pipe Conditions | Rehabilitation Method |
| Sewer | DN 600 (23.6") | Concrete | 1,000 Meters (3,281 feet) | Fully Deteriorated > 50 yrs Old | NORDILOC X |
End of Life Sewer Asset
Non-invasive approach mandatory
Varying lengths, & heavy traffic locations
Minimal flow disruption – no over-pumping
Avoid environmental and traffic disruption
No service disruption to stake holders
High level of communication to stake holders
Technology: Spiral Wound
Product: NORDILOC X
New sewer main life for minimum of 50 year
Minimal Disruption to asset owners, community and local stake holders
Non-Invasive rehabilitation method
Multiple sewer main lengths rehabilitated daily
Cost effective solution for City
Nil flow disruption
Zero environmental and traffic incidents