The Project required a versatile structural liner to rehabilitate different sized sewer mains, at varying lengths, depths and flows without interrupting service to stake holders all located throughout the city.
| Medium | Diameter | Pipe Material | Project Length | Pipe Conditions | Rehabilitation Method |
| Sewer | DN300-600 (11.8"–23.6") | Earthern Ware & Concrete | 2,000–3,000 meters ((6,562–9,843 feet) annually | Fully Deteriorated > 50yrs Old | NORDILOC X |
End of Life Sewer Asset
Non-invasive approach mandatory
Different size sewer mains
Varying lengths, depths & locations
Minimal flow disruption – no over-pumping
Avoid environmental and traffic disruption
No service disruption to stake holders
High level of communication to stake holders
Technology: Spiral Wound
Product: NORDILOC X
New sewer main life for minimum of 50 year
Minimal Disruption to asset owners, community and local stake holders
Non-Invasive rehabilitation method
Multiple sewer main lengths rehabilitated daily
Cost effective solution for City
Nil flow disruption
Zero environmental and traffic incidents